Madison Electric selects HSGS to install roof mounted Solar Energy System for NASA
Hannah Solar Government Services (HSGS) announced that Madison Electric has selected HSGS to install a roof mounted solar energy system for NASA on a new building being constructed at the Marshall Space Flight Center in Huntsville, Alabama.
Over the years, NASA has made an effort to replace and revitalize many of the pre-Apollo era facilities at Marshall Space Flight Center. These new buildings were designed to be more technologically advanced and create a smaller footprint.
NASA is using some of the same design for its new facilities as others it has recently constructed at the Marshall Space Flight Center. It will have a 120 kW solar PV system on its roof to be designed and installed by Hannah Solar Government Services.
COL Retired Dave McNeil, President and CEO of HSGS said that they are veterans proud to continue serving their country and proud to continue providing solar energy generation for NASA.