SUZLON won 100.80MW Power Project order from Renew Power
Suzlon Group won a fifth successive order from ReNew Power Ventures Pvt. Ltd. for its 100.80 MW wind power project. Suzlon will install 48 units of S111 120m wind turbine generators (WTG) with a capacity of 2.1MW in ReNew Power’s Limbwas project in Madhya Pradesh. Suzlon will also provide operation and maintenance services and dedicated life-cycle asset management services for a period of 10 years. The project is scheduled to be completed by March 2018.
The S11X 2.1 MW platform features the time tested Doubly Fed Induction Generator (DFIG) technology which is designed to optimally harness available wind resources. It not only delivers higher energy yield, but also offers higher return on investment.
Suzlon Group CEO, J.P. Chalasani said that this order is a testament of the faith and confidence reposed by ReNew Power in Suzlon’s technologically advanced products and execution capabilities. This is the fifth repeat order from ReNew Power. The S111 120m wind turbine’s cost effective design and superior performance offers reduced levelised cost of energy (LCoE). The new turbine has garnered an enthusiastic response from customer segments across the board.